PT Edge Mode Indonesia · Sovereign AI infrastructure
Indonesia's AI factories. Built to produce the best tokens. Run to refine them into value.
EdgeMode designs, builds and operates AI factories and refineries in Indonesia — from powered land to metered tokens to real-world outcomes.
The Shift
Value has moved: space → compute → tokens → utility.
Colocation sold space. Cloud sold GPU-hours. We sell tokens — finished units of reasoning — then refine them into outcomes: fraud caught, diagnoses supported, networks optimised, citizens served.
1 · Colocation - Space & power
Sold m², kW, uptime.
2 · Cloud - AI as a service
Sold GPU-hours.
3 · The token factory
Tokens: metered intelligence.
4 · The token refinery
Utility in verticals.
The most integrated operator
One operator, the whole chain.
We own every layer — land, factory, compute, platform, tokens, verticals — so tokens cost less, arrive faster and fit the workload better.
Prefabricated, liquid-cooled factories in months. GB300-class compute matched to each workload. One open platform, one bill.
Karawang · 50 MW token factory and refinery
Indonesia's first production-grade AI token factory
Under construction in the Karawang industrial belt on an 11.5-hectare, 250 MW master-planned campus.
Phase 1 design figures — subject to confirmation against the final design.
Sovereign AI, Indonesian-built
Sovereign AI, in step with the National AI Roadmap.
Indonesian-operated. Data resident in Indonesia. Running on PLN power. Built for the sectors the roadmap names first: public services, finance, health, education and the creative economy.
- 01
Talent
100,000 AI talents a year; 20 million AI-literate citizens by 2029.
- 02
Research & innovation
Applied AI in the roadmap's priority sectors.
- 03
Infrastructure & data
A national cloud in sovereign, green data centres.
Where we are
Jakarta, BSD City, Karawang.

Prosperity Tower, SCBD
Partner and client centre in Jakarta's financial core; the Super Node adds sub-millisecond compute.

D-HUB SEZ, BSD City
Headquarter and R&D centre for platform, application and AI-RAN engineering with universities and creative partners.

Karawang, West Java
First 50 MW token factory and refinery under construction; campus master-planned for 250 MW.
Next sites
A dedicated Powered Land team secures power, land, water and fibre for the factories after next.