Lahan Berdaya
Powered land: the pipeline beyond our secured sites.
A dedicated team secures the power, land, water and fibre the next factories need — years before they are built.
AI factories are constrained by electricity, not demand. The scarce asset is land with large, reliable, affordable power already attached — plus water for cooling and fibre to the world.
Our Powered Land team finds, qualifies and secures those sites across Indonesia, so every new factory starts with power in hand.
Grid
Substation capacity, feeder redundancy, long-term supply and green-certificate structures.
Land
Industrial-estate and greenfield sites with the right zoning, elevation, hydrology and seismic profile.
Water & cooling
Fresh-water supply and discharge for liquid-cooled campuses.
Connectivity
Fibre routes, carrier neutrality, proximity to submarine landing stations.
Permits & community
Environmental, spatial and building approvals, and local partnerships.
Site criteria
What the next campus must have.
- ✓
50 MW+ grid power within 24 months, with a path to 250 MW.
- ✓
Dual feeders or a dedicated substation.
- ✓
10 hectares or more, above flood level.
- ✓
Cooling-suitable water supply.
- ✓
Diverse fibre and industrial zoning.
- ✓
Module access and a host community that wants the investment.
The qualification funnel
Pipeline
Live pipeline by region and stage.
Updated quarterly. We publish regions, not parcels, to protect commercial negotiations.
| Region | Status | Capacity target |
|---|---|---|
| Jakarta | Secured | 1 MW (Super Node) |
| Karawang, West Java | Secured | 254 MW master plan |
| West Java | Under option | > 1 GW |
| Central Java | Under option | > 1 GW |
| Batam | Under option | > 1 GW |
Capacity targets are indicative and subject to final grid agreements.