Technology & Operations

The integrated stack, and how it is run.

Compute

Matched to workload.

Training & heavy reasoning

NVIDIA GB300 NVL72 today; Vera Rubin on the roadmap.

High-volume inference

Dedicated low-power accelerators for token production.

Deterministic tasks

FPGAs for sub-millisecond work: 5G signal processing, market data.

Every workload is placed on the silicon that produces the best token for the job.

Cooling & power

Engineered for the tropics.

Direct-to-chip liquid cooling captures ~90% of heat at source; warm-water loops free-cool; high-COP chillers handle the rest.

Redundant medium-voltage distribution, on-site generation, and a substation 250 metres from the halls.

Liquid-cooled racks inside an EdgeMode data hall

Operations as a discipline

Managed to numbers, published monthly.

A 24/7 operations centre with AI-assisted DCIM, coolant and power-quality management and predictive maintenance — run by an Indonesian team trained under our technology-transfer programme. We publish PUE, availability, token throughput and utilisation every month.

Live Operations Dashboard (Preview)

< 1.3
Annualised PUE
99.99%
Availability
142 kW
Avg Rack Density
24/7
Ops Centre

Dashboard populates with live API data once Karawang Phase 1 is operational.

Roadmap

From the urban edge to the campus master plan.

Phase 0 · SCBD Super Node

1 MW urban edge in Jakarta's financial core.

Karawang 50 MW

Indonesia's first production-grade token factory — under construction.

Beyond

Sites from the Powered Land pipeline.