AI Factories

AI factories, built for tokens.

Purpose-built, prefabricated, liquid-cooled. Delivered in months, not years.

An AI factory is designed from the workload backwards: 140 kW-plus racks, warm-water liquid cooling that free-cools even in Jakarta, and halls big enough to keep clusters whole.

Over 90 per cent factory-prefabricated: a 50 MW block goes from ground-breaking to ready in about six months.

Karawang · 50 MW token factory and refinery

Indonesia's first production-grade AI token factory

50.8 MW36 MW IT load336 racksPUE < 1.3under construction

Under construction in the Karawang industrial belt on an 11.5-hectare, 250 MW master-planned campus: above flood level, dedicated 150 kV/20 kV substation with redundant feeders, dedicated cooling water.

Phase 1: two storeys, six halls, 240 liquid-cooled racks at 142 kW plus 96 air-cooled — built for NVIDIA GB300 NVL72.

Land (Phase 1)25,029 m²
Gross floor area21,380 m² · 6 data halls
Racks240 liquid-cooled at 142 kW + 96 air-cooled at 20 kW
DensityUp to 142 kW per rack
Network800G/400G spine-leaf, InfiniBand for AI fabric
CoolingWarm-water direct-to-chip, closed loop
DeliveryPrefabricated modular, ~6 months from foundations to ready

Phase 1 design document figures — all figures subject to confirmation against the final design.

It produces tokens for inference and agentic work, capacity for training and fine-tuning, and a sovereign home for sector refineries — sold as throughput, clusters and refinery services, never as empty space.

Planning

Permits, grid agreements, final design.

Modules

>90% factory-completed.

Assembly

On-site, ~6 months.

Testing

Commissioning, load banks.

Handover

To 24/7 operations.

SCBD Super Node

The urban edge, under one millisecond from Jakarta's core

A 1 MW node, deployable in about two months: sub-millisecond for real-time finance and interactive AI, OJK-aligned, and the validation point for NVIDIA, Broadcom and Achronix stacks before the main campus.

1 MW
deployable capacity, scalable
< 1 ms
from Jakarta's financial core
~ 2 mo
deployment time

Status and publishable details subject to confirmation with EdgeMode.

Jakarta SCBD skyline at dusk

Design and operations standards

How we build and run a factory

Design

  • IEC and SNI standards; seismic to Indonesian codes
  • Warm-water DLC, 2–32 °C supply window
  • PUE ≤ 1.3 annualised; floor loading > 1,900 kg/m²

Construction

  • Full BIM delivery
  • Factory prefabrication above 90 per cent
  • Module transport and on-site assembly

Operations

  • AI-assisted DCIM; hot-aisle containment
  • Coolant-quality management
  • Carrier-neutral fibre near submarine landings
  • 24/7 operations centre; monthly published metrics